Thornton Big Dry Parallel

Client City of Thornton
Location Thornton
Scope Of Work Maintain active flow of 18" sewer main while installing new 21" (2,000 lf) Jack and bore under 152nd Ave. (Subcontractor); Installation of all junction manholes; Maintain a ground water dewatering system for the entirety of the project; This was a challenge from start to finish, the soil was sandy and ground water level imposing.
Schedule The project specifications allowed for a 60 day duration. R&D accomplished substantial completion in 45 days.
Project Manager Dan Ross
Tags

Project Detail

This project was a hard bid project with the City of Thornton. The objective was to upsize an existing 18″ active sanitary sewer main to a 12″ line. R&D General Contracted this project and coordinated all aspects with City Engineering.