Client City of Thornton
Location Thornton
Scope Of Work Maintain active flow of 18" sewer main while installing new 21" (2,000 lf) Jack and bore under 152nd Ave. (Subcontractor); Installation of all junction manholes; Maintain a ground water dewatering system for the entirety of the project; This was a challenge from start to finish, the soil was sandy and ground water level imposing.
Schedule The project specifications allowed for a 60 day duration. R&D accomplished substantial completion in 45 days.
Project Manager Dan Ross
Tags Sewer
Project Detail
This project was a hard bid project with the City of Thornton. The objective was to upsize an existing 18″ active sanitary sewer main to a 12″ line. R&D General Contracted this project and coordinated all aspects with City Engineering.