Client IHC, Millstone Weber
Location Denver International Airport
Scope Of Work Water Distribution: Extension of 1,300 lf of 8" steel water main; Cut in domestic, fire and hydrant services on existing 20" steel Denver Water main; Cast in place concrete junction/valve vaults and meter vaults; New cathodic protection and upgrades
Schedule An ongoing coordination effort to schedule activities over a two year duration.
Project Manager Dan Ross, Riley Lindemann
  • An

Project Detail

The three Denver International Airport Concourse Expansions are similar in all aspects of our site utility scope. The objectives were to provide water services, sanitary sewer services and roof drain extensions. The most complex utility installment was the water main extensions and services. The water piping at DIA requires welded steel pipe and fittings. Numerous water shut down coordination’s were required with expediting work of the upmost importance. Daily challenges included locating and potholing existing utilities and often adjusting line and grade to accommodate. The sites are always congested with all trades and coordination with the joint ventures, City inspectors and other subcontractors is a constant part of accomplishing quality work and schedule.